Keezer build, the final chapter

We built the full keezer this weekend, all that is left is the finish.

It was we took the three panels and attached them to a  base, with casters.

Assembly was a snap.

In we slid the Haier 7.1, then attached the collar.  We used silicone and screws.

From here we drilled the holes for shanks and the cross braces for drip tray.

The top was screwed and glued.

Day two brought the mechanical.  Installing regulators, a manfold and the taps.

The temp control is on the back.  The finished keezer is beautiful.

Thanks to my Father in Law, Dave.  

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

Up ↑

%d bloggers like this: